ARI completes Installation of Drilling & Well Control and Hydraulic Fracturing Simulator, July 2019

ARI has installed and commissioned 2 stations of the ARI Drilling and Well control simulator and 2 licenses of hydraulic fracturing simulation and computer based training framework at the  UT Region Centro De Coahuilla, Mexico. The installed simulators will be used by graduate and post graduate students for academic and research purposes.